Rolling a validated change across hundreds of devices and regions is done site by site, by hand. It takes weeks, drifts from the standard, and a single mistake can take down a region.
"A change we validated in an afternoon takes six weeks to roll out — and by week four, no two sites are quite the same."
Rollout duration
Configuration drift
To first orchestrated rollout